Construction07 Aug 2026· 4 min read
Subcontractor Asset Control on Multi-Trade Sites
When five trades share a lay-down yard, ownership blurs fast. Clear issue rules keep it clean.
Shared yards need hard boundaries
On a busy Sandton high-rise you may have formwork, electrical, plumbing and HVAC crews drawing from the same store.
Rules that hold
- Every subcontractor gets its own custody ledger
- No item leaves the store without a destination
- Weekly reconciliation signed by the site agent
Disputes drop sharply once each trade can see its own outstanding list.
Get started
Track every tool, machine and crate with signed custody evidence. Start a 30-day free trial of iinventory.
Start free trial